During operation and decommissioning stages, noise will be generated mainly from:! vehicles using the fill bank! the loading of public fill onto barges, particularly as the trucks reverse up the unloading facility in low gear with their reverse sirens sounding! the initial loads of material discharge onto an empty metal barge and cause reverberations! the operation of the machinery in the Construction and Demolition Material Sorting FacilitSince the fill bank is located in a remote area and far away from the residential areas, the noise impact during operation and decommissioning stages will not be significant.