建筑工程领域的环境管理当前面临的最大阻碍就是资金投入不足。建筑工程的环境管理成本,主要就是相关环保物质与管理措施经费,这些占建筑工程成本的比的英语翻译

建筑工程领域的环境管理当前面临的最大阻碍就是资金投入不足。建筑工程的环

建筑工程领域的环境管理当前面临的最大阻碍就是资金投入不足。建筑工程的环境管理成本,主要就是相关环保物质与管理措施经费,这些占建筑工程成本的比例相对比较高,直接影响到的就是建筑工程的利润水平。近些年来随着环境保护要求的不断提高,建筑企业的环境保护投资资金占企业总投资的比例也进一步拉大,对于利润率比较高的优秀建筑企业来说还能基本承受得住,而对较低利润的,甚至还在亏损的建筑企业来说则是无法承受的经济负担。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
The biggest obstacle currently facing environmental management in the field of construction engineering is insufficient capital investment. The cost of environmental management of construction projects is mainly related to environmental protection materials and management measures. These account for a relatively high proportion of the cost of construction projects, and directly affect the profit level of construction projects. In recent years, with the continuous improvement of environmental protection requirements, the proportion of environmental protection investment funds of construction enterprises in the total investment of enterprises has also further increased, which can basically be affordable for excellent construction enterprises with relatively high profit margins. It is an unbearable economic burden for construction companies with lower profits or even losses.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
The biggest obstacle to environmental management in the field of construction is the lack of capital investment. The environmental management cost of construction project is mainly related to environmental protection materials and management measures, the proportion of these construction costs is relatively high, the direct impact is the profit level of construction projects. In recent years, with the continuous improvement of environmental protection requirements, the proportion of environmental protection investment funds of construction enterprises to the total investment of enterprises has been further widened, for the higher profit margin of excellent construction enterprises can basically bear, and for the lower profits, and even in the loss of construction enterprises is an unbearable economic burden.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
The biggest obstacle of environmental management in the field of construction engineering is the lack of capital investment. The environmental management cost of construction engineering is mainly related to environmental protection materials and management measures, which accounts for a relatively high proportion of construction engineering cost, and directly affects the profit level of construction engineering. In recent years, with the continuous improvement of environmental protection requirements, the proportion of environmental protection investment funds of construction enterprises in the total investment of enterprises is also further enlarged. For excellent construction enterprises with high profit rate, they can basically bear it, while for construction enterprises with low profit rate and even loss, it is an unbearable economic burden.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: