pipeline from station of wastes collection inside the battery limits of the benzene purification plant and the charging and discharging tank battery that is part of the plant and to the limits of the 986 building of Sodium carbonate shop;
– in case of construction of local treatment facilities – sewer communications from borders of the local treatment facilities which are a part of the plant and to sumps of sewage collectors of the corresponding drains including tie-in sections.
Engineering surveys(with report)and design documentation for the benzene purification plant(complete with the Declaration of industrial safety)in accordance with the codes and rules of the Russian Federation and with obtaining: