There is an iron and steel industrial base about 25km upstream of the 的简体中文翻译

There is an iron and steel industri

There is an iron and steel industrial base about 25km upstream of the reservoir, and a very important iron and steel heavy industrial base about 50km downstream of the reservoir, which is a densely populated heavy inThe project is a comprehensive utilization project of water conservancy and hydropower. According to the provisions of sdj12-78 and its supplementary provisions, the total storage capacity of the project is 1 billion cubic meters, which belongs to class II. ; the installed capacity is 4.0 10000 kW, which belongs to the third category; the protection and water supply of extremely important towns and industrial areas belong to the first class; therefore, the project belongs to the first-class project. The main hydraulic structure is level I, and the safety level of the main structure is level II. Since the design area is ft area and hilly area, the annual design (P = 0.1%) and annual inspection (P = 0.01%) are adopteddustrial city.
0/5000
源语言: -
目标语言: -
结果 (简体中文) 1: [复制]
复制成功!
水库上游约25公里处有一个钢铁工业基地,水库下游约50公里处有一个非常重要的钢铁重工业基地,是一个人口稠密的重工业基地。该项目是水利水电综合利用项目。根据sdj12-78及其补充规定,该项目的总存储容量为10亿立方米,属于II类。; 装机容量为4.0 10000 kW,属于第三类;极为重要的城镇和工业区的保护和供水属于第一流;因此,该项目属于一流项目。主体液压结构为一级,主体安全等级为二级。
正在翻译中..
结果 (简体中文) 2:[复制]
复制成功!
There is an iron and steel industrial base about 25km upstream of the reservoir, and a very important iron and steel heavy industrial base about 50km downstream of the reservoir, which is a densely populated heavy inThe project is a comprehensive utilization project of water conservancy and hydropower. According to the provisions of sdj12-78 and its supplementary provisions, the total storage capacity of the project is 1 billion cubic meters, which belongs to class II. ; the installed capacity is 4.0 10000 kW, which belongs to the third category; the protection and water supply of extremely important towns and industrial areas belong to the first class; therefore, the project belongs to the first-class project. The main hydraulic structure is level I, and the safety level of the main structure is level II. Since the design area is ft area and hilly area, the annual design (P = 0.1%) and annual inspection (P = 0.01%) are adopteddustrial city.
正在翻译中..
结果 (简体中文) 3:[复制]
复制成功!
水库上游约25km处有钢铁工业基地,水库下游约50km处有一个非常重要的钢铁重工业基地,是一个人口密集的水利水电综合利用工程。根据sdj12-78及其补充规定,本工程总库容为10亿立方米,属二级库容。;装机容量4.0万千瓦,属三类;特重要城镇和工业区的保护和供水属一类,属一类。主体水工建筑物为一级,主体结构安全等级为二级。由于设计区域为ft区和丘陵区,因此采用工业城市的年度设计(P=0.1%)和年度检查(P=0.01%)。
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: