The automatic control subroutine of this system is designed according to the designed process flow. When the reverse coal flow is started and stopped, the reverse coal flow is stopped to deal with. There is a certain interlocking function between the equipment. When there is a fault, it should be dealt with quickly to solve the problem and prevent the occurrence of stacking. The startup procedure and interlocking procedure of the system equipment are shown in figure 5-10: