1. Before the start of production, the production personnel BOM table checks whether the position and P/N of the component loading are correct, and the quality IPQA is responsible for checking and confirming
1. Before the start of production, the production personnel BOM table check to confirm that the component material on the station and P/N is correct, and the quality IPQA is responsible for checking the confirmation
1. Before the start of shift production, the production personnel shall check the BOM to confirm whether the position and P / N of component loading are correct, and the quality IPQA shall be responsible for checking and confirming<br>