1. The erection of formwork must accurately grasp the geometric dimension of components to ensure the accuracy of axis position.<br>2. The formwork shall have sufficient strength, rigidity and stability, and can reliably bear the weight, side pressure and construction load of the newly poured concrete. Before pouring, check whether the bearing frame and reinforcement support fastener are tightened.<br>
正在翻译中..