CS will perform label remediation to the left 40% of network cable connection in the Zhuhai comms room - During the patching label remediation exercise, there will be NO physical shutdown of IT equipment - Although no disconnection network cable is excepted during the network patching label remediation exercise , IT will arrange full pre and post system check to ensure all systems are ready after the label remediation exercise