Fixed distance positioning. According to the structural requirements, measure the distance between the inner and outer poles and the wall with ruler at the four corners of the building, and mark it well; straighten with steel tape, divide the pole position, and point out the pole mark with small bamboo pieces; the base plate and base plate should be accurately placed on the positioning line, and the base plate must be laid flat without hanging.