Construction quality inspection<br><br>(1) Construction records <br>During the construction process should be responsible for the record, detailed record of each pile sinking time, lifting time, sinking speed, lifting speed, mortar production, depth recording error must not be greater than 100 mm, time record error should not be greater than 5 seconds. Construction records must be checked at all times during the construction process. And against the prescribed construction process for each pile quality assessment.<br>(2) Pile quality<br>After mixing and construction, the clay sealwall was separated by 100 m drilling soil sample test, drilling arrangement clay sealwall in the middle position (after the drilling must be backfilled with clay ball), sampling spacing of 1 m, mainly for grain analysis (including sticky particles) and penetration test.
正在翻译中..