施工质量检验①施工记录 施工过程中应由专人负责记录,详细记录每根桩的下沉时间、提升时间、下沉速度、提升速度、灰浆制作,深度记录误差不得大于1的英语翻译

施工质量检验①施工记录 施工过程中应由专人负责记录,详细记录每根桩的下

施工质量检验①施工记录 施工过程中应由专人负责记录,详细记录每根桩的下沉时间、提升时间、下沉速度、提升速度、灰浆制作,深度记录误差不得大于100 mm,时间记录误 差不得大于5秒。施工过程中必须随时检查施工记录。并对照规定的施工工艺对每根桩进行质量评定。②桩身质量在拌和施工后对粘土密封墙分别作间隔100 m 钻孔取土样试验,钻孔布置粘土密封墙中间位置(钻孔结束后须用粘土球回填),取样间距1 m,主要进行颗 粒分析(含粘粒)和渗透试验。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Construction Quality Inspection <br><br>① construction records <br>during construction shall be the person responsible for recording, detailed records of each pile sinking time, rise time, sinking speed, lifting speed, mortar production, the depth of the recording error no larger than 100 mm, the error shall not record time Greater than 5 seconds. Construction records must be checked at all times during construction. And the quality evaluation of each pile is carried out according to the specified construction process. <br>②The quality of the pile body <br>shall be tested for soil sampling of the borehole of the clay seal wall at intervals of 100 m after the mixing construction. The borehole shall be placed in the middle of the clay seal wall (after the borehole is completed, it shall be backfilled with clay balls). The sampling interval is 1 m, mainly Carry out particle analysis (including clay particles) and penetration test.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Construction quality inspection<br><br>(1) Construction records <br>During the construction process should be responsible for the record, detailed record of each pile sinking time, lifting time, sinking speed, lifting speed, mortar production, depth recording error must not be greater than 100 mm, time record error should not be greater than 5 seconds. Construction records must be checked at all times during the construction process. And against the prescribed construction process for each pile quality assessment.<br>(2) Pile quality<br>After mixing and construction, the clay sealwall was separated by 100 m drilling soil sample test, drilling arrangement clay sealwall in the middle position (after the drilling must be backfilled with clay ball), sampling spacing of 1 m, mainly for grain analysis (including sticky particles) and penetration test.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Construction quality inspection<br>① Construction records<br>During the construction process, special personnel shall be responsible for recording the sinking time, lifting time, sinking speed, lifting speed and mortar production of each pile. The depth recording error shall not be greater than 100 mm, and the time recording error shall not be greater than 5 seconds. Construction records must be checked at any time during construction. The quality of each pile shall be evaluated according to the specified construction process.<br>② Pile body quality<br>After the mixing construction, the clay sealing wall shall be drilled at an interval of 100 m for soil sample test, and the middle position of the clay sealing wall shall be arranged for drilling (the clay ball shall be used for backfilling after the completion of drilling). The sampling interval is 1 m, mainly for particle analysis (including clay particles) and penetration test.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: