为了保证工程施工符合设计文件的要求,在施工之前就一定要把设计单位提交的全部控制桩点(如:平面控制点,水准点等)进行复核检测。施工复核检测的工的英语翻译

为了保证工程施工符合设计文件的要求,在施工之前就一定要把设计单位提交的

为了保证工程施工符合设计文件的要求,在施工之前就一定要把设计单位提交的全部控制桩点(如:平面控制点,水准点等)进行复核检测。施工复核检测的工作内容具体包括有导线、中线、水准点和横断面等。施工复核检测测的主要目的是检验原有的桩号的准确性,而不是重新测设。所以,经过复核检测,所有与原来的成果过点位的差值在允许的范围内时,全部以原有的成果为准,不改动。并经过多次复核检测确定,证明原有成果的错误或点位有比较大的变动时,报有关单位,经审批后,才能改动。施工前,除回复中桩外,为了施工方有关单位,经审批通过后,才能改动。施工之前,除了恢复中桩以外,为了施工的方便,还需要加设临时的水准点。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
In order to ensure that the project construction meets the requirements of the design documents, all control pile points (such as plane control points, leveling points, etc.) submitted by the design unit must be reviewed and checked before construction. The work content of construction review and inspection specifically includes conductor, midline, leveling point and cross section. The main purpose of the construction review inspection is to check the accuracy of the original pile number, not to re-test. Therefore, after reviewing and checking, if the difference between the original point and the original result is within the allowable range, the original result shall prevail and no change shall be made. And after repeated review and determination, it is proved that the original results are wrong or there is a relatively large change in the point, and it should be reported to the relevant unit, and can only be changed after approval. Before construction, in addition to reverting to the middle pile, it can only be changed after being approved for the construction unit. Before the construction, in addition to the restoration of the middle pile, for the convenience of construction, a temporary leveling point needs to be added.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
In order to ensure that the construction meets the requirements of the design documents, before the construction must be the design unit submitted all the control pile points (e.g. flat control points, level points, etc.) for review and testing. The work of construction review testing includes conductors, mid-line, level points and cross-sections. The main purpose of the construction review test is to verify the accuracy of the original station, not to re-test. Therefore, after reviewing the test, all the difference with the original results over-point points in the permitted range, all to the original results, no changes. And after a number of review and testing to determine, to prove that the original results of the error or location has a relatively large change, reported to the relevant units, after approval, can be changed. Before construction, in addition to replying to the middle pile, in order to the construction party related units, after approval and approval, can be changed. Before construction, in addition to the restoration of the middle pile, in order to facilitate the construction, it is also necessary to set up temporary level points.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
In order to ensure that the project construction meets the requirements of the design documents, all the control pile points (such as plane control points, benchmark points, etc.) submitted by the design unit must be rechecked and tested before construction. The work content of construction recheck and inspection specifically includes conductor, central line, benchmark and cross section, etc. The main purpose of construction recheck detection and survey is to check the accuracy of the original pile number, rather than re survey. Therefore, after rechecking and testing, when the difference between the original results and the original results is within the allowable range, the original results shall prevail and remain unchanged. If it is confirmed through multiple rechecks and tests that the original results are wrong or there is a relatively large change in points, it shall be reported to the relevant units and can only be changed after approval. Before construction, in addition to reply to the middle stake, it can only be changed for the sake of relevant units of the construction party after approval. Before the construction, in addition to the restoration of the middle pile, in order to facilitate the construction, it is also necessary to add temporary benchmarks.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: