Operating vents and drains are required for normal operation of equipment and piping. Operating vent and drains shall be located at the high and low points of vessels, heat exchangers and on piping where required so that the equipment and associated piping can be vented/ drained. These vents and drains are shown on the P&ID’s and shall be fitted with valves in accessible locations. The minimum size shall be DN25.