Other matters<br>1, the required water source, gas source should be supplied to the furnace.<br>2, the required power supply side to the furnace, furnace body to the electrical control cabinet wire, wire tube, wire clip by the demand side to bring it.<br>3, the need side is responsible for coordination with the user, to ensure the site of water, electricity, gas, site and personnel supply and cooperation, as follows: electricity: 380VAC 5%, 50Hz , 5%, 220VAC , 5%, 50Hz , 5%, to provide a separate line in line with the national standard. Environment: The temperature control system must not have harmful gases such as dust and fumes. If the ambient temperature is very high, you can choose the special air conditioning of the electronic control cabinet, the price is calculated.
正在翻译中..