AbstractThe design section of Highway Construction ,located in kunyu Highway near by Majin toll station ,starting with high –speed dial-phase,the end of Soul Mountain Road and the proposed phase.The construction organization design is for the highway project,in pre-construction site for the project itself, the specific characteristics and circumstances , in accordance with the engineering requirements,the required construction labor, construction materials,construction equipment and construction of temporary facilities, a scientific basis, well Comparision of preparation and reasonable arrangements set out in reasonable time and space for the construction of the strategic plan document. Main content including the preparation of the basis and principle, the project overview,construction Bushi, construction preparation, construction methods and measures of major projects,various promises measures, construction technology flow chart main content, compile targeted construction Zuzhisheji, Mei Gefen part of the project characteristics, structural features, construction schedule and quality requirements for the degree of difficulty, the preparation of the feasible construction plan, to guide construction and successfully complete the project’ construction, control engneering invest, create high quality project.Keywords: construction design engineering charicteristics construction method