Quality Department: ①The proportion of bad thread gauges is ≤5%; ②M10 clamping force test 5pcs per batch; ③Installed on the testing platform for testing 3pcs per batch.
Quality Department: ① The proportion of defective thread gauges is ≤ 5%; ② M10 clamping force test: 5 samples per batch; ③ Install and test 3 pieces per batch on the testing platform.
Quality Department: ① The defective ratio of thread gauge is ≤ 5%; ②M10 clamping force test: 5 PCs per batch; ③ Install it on the testing platform and test 3pcs in each batch.