1. The final assembly controls the tightening torque to ensure that the torque requirements are met without damaging the sealing ring.<br>2. The incoming quality control department controls the quality of the supplier's incoming parts.<br>3. After the existing problems are strictly controlled, there will be shutdown risk. It is recommended that the problem be escalated to L2.
正在翻译中..