Selection of commonly used diesel generator sets<br><br>Commonly used generator sets have long working hours, load curve changes greatly, unit capacity, number of units, type selection and unit control mode is different from emergency units. (1) Capacity determination: according to the long-term continuous operation of the unit output power can meet the maximum computing load selection of the whole project, and should be based on the importance of the load to determine the capacity of the generator set backup unit. The continuous output power of diesel engines is generally 0.9 times the calibration power. (2) The determination of the number of units: the general setting is usually more than 2 units, to ensure the continuity of power supply and adapt to the change of the electricity load curve. The number of units is large, in order to determine the number of units put into the generator set according to the change of electricity load, so that diesel engines are often operated under economic load, in order to reduce fuel consumption rate, reduce the cost of power generation. The best economical operating condition for diesel engines is between 75% and 90% of the calibrated power. In order to ensure the continuity of power supply, the commonly used units themselves should consider setting up spare units. (3) The determination of the speed: the general civilian should choose the speed of 1000 to 1500 rpm of high-speed units, and the speed of 300 to 350 rpm of low-speed units suitable for marine host. (4) Voltage determination: generator output voltage determination and emergency generator set is the same, generally 400V, individual electricity consumption is large, transmission distance of the project optional high-voltage generator set.<br>Selection of backup diesel generator sets<br><br>When the sum of the load capacity is multiplied by the calculated load after the demand factor is less than the capacity of the emergency diesel generator set, the backup factor is considered according to 1.2, i.e. 1.2 times the calculated capacity is less than the capacity of the emergency diesel generator set, which is powered by the emergency generator set after the power failure. When the sum of the load capacity is multiplied by the calculated load after the need factor is greater than the capacity of a single emergency diesel generator set, 2 automatic generator sets with the same capacity, pressure adjustment and speed control characteristics can be selected. After the power failure, one or two of the units to the life and commercial electricity supply, when the municipal power failure, and fire, by 2 units to the fire load power supply, in order to facilitate fire protection.<br>Selection of emergency diesel generators<br><br>Emergency diesel generators are generally suitable for the selection of high-speed, supercharged, low fuel consumption, the same capacity of diesel generator sets. High-speed supercharged diesel engine single-engine capacity is larger, occupy small space, diesel engine with electronic or hydraulic speed control device, speed control performance is better, generators should choose with brushless excitation or phase re-excitation device synchronous motor, more reliable, low failure rate, maintenance and maintenance is more convenient; When the capacity of a single air conditioner or motor is large in the first load, it is advisable to select a generator set with three harmonic excitations, the machine is assembled on a common chassis with shock absorbers, and the exhaust pipe outlet should be equipped with a muffler to reduce the impact of noise on the surrounding environment. (1) Capacity determination: emergency diesel generator set for emergency use, often in standby emergency start-up state, continuous operation time is not long, generally not more than 8h, so you can press the "spare power" to determine the capacity. According to the sum of the capacity of the primary load (excluding spare capacity), the modified unit capacity is considered and the starting requirements of the largest motor in the first load can be met, the capacity of the emergency diesel generator set is determined. Emergency generators generally use a three-phase ALTER generator with a calibration output voltage of 400V. (2) The determination of the number of units: generally choose 1 automation, speed 1000 to 1500 rpm, brushless excitation, 400/230V, three-phase four-wire with control screen, charge and discharge equipment and common chassis generator set. Shared chassis with daily fuel tanks can be required to reduce lines and footprint. In addition, from the reliability considerations can also choose 2 units in parallel power supply. The number of generator sets for emergency use should not generally exceed 3. When elected to use multiple units, the unit should try to choose the same model, the same capacity, pressure control, speed control characteristics of similar complete sets of equipment, the use of fuel properties should be consistent, in order to carry out maintenance and common spare parts.
正在翻译中..