Provision for mixing at least four gases (Air, Oxygen, Nitrogen and CO2), Thermal mass flowmeter automatic control gas flow, valves, gas mix station to be included. Air filtration with membrane filter Supply capacity for fermenter: Air: upto 2 VVM, Oxygen ≥ 0.5 VVM, Sparger – One number sparger.