3.3.3 Before the inner wall is dusted, first release on the ground the的简体中文翻译

3.3.3 Before the inner wall is dust

3.3.3 Before the inner wall is dusted, first release on the ground the whitewash thickness of each room large sample lines, the dust thickness of the loft line from the wall is controlled within 1 to 2cm, the loft line must be angular square, the whole side of the yang angle.3.3.4 The roof measures its flatness before dusting, polishes and mends the unevenness of the surface, and then erases the ash as required.3.3.5 sets square, hanging straight, made of gray cake. Before erasing the bottom layer of gray must first find good rules, that is, four-corner rules, horizontal line to find flat, vertical line hanging straight, pop-up baseline and kick line, and according to indoor graying requirements to do a good job of gray cake.3.3.6 Wall punches, to be hardened, using the same mortar as the plaster layer. In the upper and lower gray cake between the line 30 to 50mm wide mortar belt, and above, under the gray cake for the ruler flattening, punching completed and wait for a little dry, before the wall bottom plastering work.3.3.7 do guard angle: according to the gray cake and door frame edge from the gap in the wall, with square ruler square, respectively, on both sides of the yang angle hanging straight and fixed the foot plate, wipe out the cement mortar guard angle, and use the yang angle smear to push out the small fillet, and finally use the foot plate, 50mm outside the yang corner position, with 40o angle to remove the mortar, clean.3.3.8 before erasing the bottom ash, in advance will be the wall wet, waiting for the wall when there is no open water on the wall to dump cement slurry (or brush interface agent), and maintenance, and then wipe the bottom ash, the thickness of the bottom ash is generally controlled at 5 to 7mm, until the bottom ash slightly dried, and then the same mortar to wipe the thickness of the middle layer of 7 to 9mm. After the middle layer of gray wipe to find flat and comprehensively check its verticality, flatness, yin and yang angle is square, straight, found that the problem should be repaired and dealt with in a timely manner.3.3.9 layers of plaster according to the design requirements mixed plaster, kitchen, bathroom and other veneer brick wall layer made of wool, other batch of putty wall press or shimmer.3.3.10 Key points of greying construction:Before smearing should check whether the window frame position is correct, and the wall connection is strong, aluminum alloy and aluminum alloy doors and windows used in the seam material should meet the design requirements, and the inlay is dense, and pre-paste the protective film, before erasing must first find good rules, that is, four corners Rules, horizontal line flattening, vertical line hanging straight, ejection baseline and kicking line, indoor wall, column yang angle and door and window hole yang angle, with l:2 cement mortar to wipe out the guard angle, and with the angle and cement sand The pulp is out of the small fillet; the grass roots should first use 1% caustic soda to clean the wall oil before smearing, and then use the water-doped weight of 2% 108 glue 1:1 cement glue to throw on the wall or top, finally watering maintenance Until the cement mortar moths are all glued to the surface of the crucible and have a high strength (until the hand is not moving), then the walls and roofs are dusted, and the brick walls and walls should be fully watered and moisted one day in advance before the ash is erased. Cement mortar surface laminated light must not be less than twice, and should master the pressing time, so as not to cause empty drums and hemp surface, cover the next day after the sprinkler maintenance. Paper-reinforced gray cover surface should be carried out in the base ash 5 to 6 dry, cover face is pressed twice to catch up with the light. Window sills, window stilettos, rain canopies, tops and prominent waistlines, etc., to strictly follow the detailed practices and requirements, careful construction, before the construction should play a good baseline, and the grass-roots to do careful treatment, to prevent the emergence of empty drums, skew, water, up and down the straight and other phenomena, resulting in rework.
0/5000
源语言: -
目标语言: -
结果 (简体中文) 1: [复制]
复制成功!
3.3.3在对内壁进行除尘之前,首先将每个房间的大型采样线的粉尘厚度释放在地面上,离墙壁的放样线的灰尘厚度控制在1至2cm之内,放样线必须为角正方形,整个阳角。<BR>3.3.4屋顶在撒粉前先测量其平整度,抛光并修补表面的不平整度,然后根据需要清除灰烬。<BR>3.3.5套正方形,垂直,由灰蛋糕制成。在擦除底层灰色之前,必须首先找到良好的规则,即四角规则,水平线找到平坦,垂直线垂直,弹出基准线和底脚线,并根据室内的灰色要求做好蛋糕的工作。<BR>3.3.6使用与灰泥层相同的砂浆硬化的墙冲头。在上,下灰饼之间行30至50mm宽的砂浆带,并在上方,下灰饼进行直尺压扁,打孔完毕,稍等干,然后在墙底抹灰工作。<BR>3.3.7做护角:根据灰饼和门框边缘从墙体的缝隙开始,用直尺直角尺将阳角的两侧分别垂直并固定好脚板,抹去水泥砂浆护角,并用阳角涂抹将小圆角推出,最后用脚板,在阳角外50mm处,以40o角去除砂浆,进行清洁。<BR>3.3.8清除底灰之前,请先将墙壁弄湿,等待墙壁没有开水时在墙壁上倾倒水泥浆(或刷界面剂),并进行维护,然后擦拭底灰,底灰的厚度一般控制在5至7mm,直到底灰稍微干燥,然后用相同的砂浆将中间层的厚度擦拭7至9mm。中层灰色抹布找平后,全面检查其垂直度,平整度,阴阳角是否为正,直角,发现问题应及时修复和处理。<BR>3.3.9灰泥层按设计要求混合的灰泥,厨房,浴室和其他饰面用羊毛制成的贴面砖墙层,其他批腻子壁压或微光。<BR>3.3.10变灰施工的要点:<BR>涂抹前应检查窗框位置是否正确,墙壁连接是否牢固,接缝材料所使用的铝合金及铝合金门窗应符合设计要求,嵌体致密,并预先粘贴防护层胶卷,擦除之前必须首先找到良好的规则,即四个角规则,水平线展平,垂直线垂直,射出基线和踢线,室内墙,柱阳角和门窗孔阳角,以l:2为准用水泥砂浆擦掉护角,并用护角和水泥砂浆从小圆角中取出;基层在涂抹前应先用1%的苛性钠清洗墙面油,然后再使用2%的水重108胶水和1:1水泥胶将其涂抹在墙壁或顶部上,最后浇水维护,直到水泥砂浆飞蛾全部粘到坩埚表面并具有高强度(直到手不动为止)为止,然后对墙壁和屋顶进行除尘,然后对砖墙和墙壁进行充分浇水并清除灰烬前一天要先弄湿。水泥砂浆面层光不得少于两次,并应掌握压紧时间,以免造成空桶和麻面,第二天盖好洒水喷头后进行维护。用纸加固的灰盖表面应在灰烬中进行5至6次干燥,压盖表面两次以赶上光线。窗台,窗饰短剑,雨蓬,上衣和突出的腰围等,要严格遵循详细的操作规范和要求,精心施工,
正在翻译中..
结果 (简体中文) 2:[复制]
复制成功!
3.3.3 在内壁除尘前,首先在地面上释放出每个房间大样线的粉刷厚度,阁楼线的灰尘厚度从墙面控制在1至2厘米以内,阁楼线必须是角方形,整个侧面为阳角。<BR>3.3.4 屋顶在除尘、抛光和修补表面的不均匀性之前测量其平整度,然后根据需要擦除灰烬。<BR>3.3.5 套方形,直挂,由灰色蛋糕制成。在擦除底层灰色之前,必须首先找到好的规则,即四角规则,水平线要找到平坦,垂直线挂直,弹出基线和踢线,并根据室内灰度要求做好灰饼。<BR>3.3.6 墙面冲孔,要硬化,使用与石膏层相同的砂浆。在上、下灰色蛋糕之间线30至50毫米宽的砂浆带,及以上,在灰色蛋糕下为尺子平整,打孔完成,等待一点干燥,在墙底涂上工作。<BR>3.3.7 做护罩角度:根据灰色蛋糕和门框边缘从墙缝处,用方尺方形,分别在阳角两侧直挂固定脚板,擦掉水泥砂浆护罩角,并用阳角涂抹推出小圆角,最后用脚板,50mm外的阳角位置,用40o角去除砂浆,干净。<BR>3.3.8在擦除底部灰烬之前,会提前将墙体弄湿,等待墙体上没有开水时倾倒水泥浆(或刷接口剂),并进行维护,然后擦拭底部灰烬,底部灰烬的厚度一般控制在5至7毫米,直到底部灰烬稍干,然后用同样的砂浆擦去中间层7至9毫米的厚度。经过中间层的灰擦寻找平整,全面检查其垂直度、平整度、阴阳角是否方、直,发现问题应及时修复和处理。<BR>3.3.9层石膏按照设计要求混合石膏,厨房、浴室等贴面砖墙层由羊毛制成,其他批次的腻子墙压机或微光。<BR>3.3.10 灰施工要点:<BR>涂抹前应检查窗框位置是否正确,且墙体连接牢固,铝合金和铝合金门窗使用的接缝材料应符合设计要求,且镶嵌密度大,并预粘贴防护膜,擦除前必须先找到好规则,即四角规则、水平线扁平化、垂直线挂直,弹射基线和踢线,室内墙,柱阳角和门窗孔阳角,用l:2水泥砂浆擦去护角,并用角度和水泥砂浆是出小圆角:基层应先用1%的烧碱在涂抹前清洗墙油,然后用掺水重量为2%的108胶1:1水泥胶水扔在墙上或上面,最后浇水保养,直到水泥砂浆飞蛾全部粘在熔炉表面并具有高强度(直到手不动),然后墙壁和屋顶被灰尘,砖墙和墙壁应提前一天完全浇水和滋润之前,灰烬被清除。水泥砂浆表面层压光不得少于两次,并应掌握紧要时间,以免造成空桶和麻面,盖住后第二天洒水器进行维护。纸强化灰盖表面应进行基灰5至6干燥,盖面应按两次以赶上光线。窗台、窗台、雨篷、上衣和突出腰围等,要严格按照详细的做法和要求,精心施工,施工前要打好基线,对基层要认真处理,防止出现空鼓、歪、水、上下直等现象,造成返工。
正在翻译中..
结果 (简体中文) 3:[复制]
复制成功!
3.3.3内墙除尘前,先在地面上放出各房间粉刷厚度大样线,放样线距墙的除尘厚度控制在1~2cm以内,放样线必须是棱角方正,整个边阳角。<BR>3.3.4屋面在除尘前测量其平整度,对表面不平处进行打磨修补,并按要求抹去灰烬。<BR>3.3.5套方形,直挂,灰色蛋糕制成。在擦除底层灰之前首先要找到好的规则,即四角规则,水平线找平,垂直线挂直,弹出基线和踢线,并根据室内灰化要求做好灰饼。<BR>3.3.6墙壁冲头,使用与抹灰层相同的砂浆进行硬化。在上下灰饼之间划线30~50mm宽的砂浆带,并在上面、下灰饼处用直尺找平,打孔完毕,待稍干后,再进行墙底抹灰工作。<BR>3.3.7做护角:根据灰饼与门框边缘离墙的缝隙,用方尺方正,分别在两侧阳角上挂直并固定好脚板,擦净水泥砂浆护角,并用阳角涂片推出小圆角,最后用脚板,阳角位置外50mm,以40o角清除砂浆,清理干净。<BR>3.3.8抹底灰前,事先将墙面打湿,待墙面无明水时向墙面倾倒水泥浆(或刷界面剂),并进行养护,然后抹底灰,底灰厚度一般控制在5~7mm,直至底灰稍干,然后用同一砂浆抹中间层厚度为7~9mm。后将中间层灰抹找平,全面检查其垂直度、平整度、阴阳角是否方正、平直,发现问题应及时修复处理。<BR>3.3.9抹灰层按设计要求混合抹灰,厨房、卫生间等贴面砖墙面层用羊毛制成,其他批腻子墙面压光或擦光。<BR>3.3.10灰化施工要点:<BR>涂刷前应检查窗框位置是否正确,与墙面连接是否牢固,铝合金及铝合金门窗所用的接缝材料应符合设计要求,且镶嵌密实,并预贴保护膜,涂刷前必须先找好规矩,即四角尺,水平线压平,垂直线挂直,弹出底线和踢脚线,室内墙、柱阳角和门窗洞口阳角,用l:2水泥砂浆擦出护角,用角和水泥砂浆出小圆角;基层涂刷前应先用1%烧碱将墙面油污清洗干净,然后用掺水重量为2%108胶1:1的水泥胶抛在墙面或顶部,最后浇水养护,直至水泥砂浆飞蛾全部粘在坩埚表面并具有较高的强度(直至手不动),然后进行养护墙壁和屋顶都要撒上灰尘,砖墙和墙壁要提前一天充分浇水湿润,然后才能擦去灰烬。水泥砂浆面层压光不得少于两遍,并应掌握压光时间,以免造成鼓面空鼓和麻面,第二天覆盖后洒水养护。纸加固灰罩面应在底灰5~6中进行干燥,罩面要压两遍以赶光。窗台、窗棂、雨篷、上衣和突出腰线等,要严格按照详细做法和要求,精心施工,施工前要打好基线,并对基层做细致处理,防止出现空鼓、歪斜、积水,上下直等现象,造成返工。<BR>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.