1. Adjustable spring: attached (76005-1 PDF) you can find the model of the spring which shows the technical datas. As you can see in the drawing D404B001 rev. 4, the spring is leaned at +100 mm, while in operation it will have a height of 707 mm. In the picture you’ve sent the Teflon upper table is not the circular one (please refer to the attached pictures). We also attach its manual for your reference. P402 installation: in the sketch you’ve sent, it’s indicated the simulacrum of the pump used for the pre-assembling of the system at the manufacturer workshop. The pump is to be installed in its foundation plinth as per drawing B040A001 rev. 4 (finished plan at +863 mm), drawing D405A001 rev. 4 and expansion bolt list W000BE05 rev. 1. Drawing for the modification of the drilling of the flange will follow.Pipeline K-401 to V.403: PIPING MATERIAL IS IN Teli scope2.Capstan of PK790/791 as well as capstan of KL710/711 are in Teli scope