1, because the bad state is based on the physical picture after the analysis, so only the three possible causes of one by one list, and not open supercharged is only one of the possible causes.<br> However, if there is a possibility that a problem with the boost is not opened due to an operational error while adjusting the machine. After follow-up foremost commissioning, the product must fill out a 4M change order to the inspector to confirm the qualification before the mass production.<br> Normal batch die-casting is fully automatic production.<br>2. At present, Jiali to die-casting machine is not open set up with cold mold automatically abandoned program error-proof function, is by manual intervention screening.<br>3. Feeding the soup machine is indeed set by the parameters of the machine control panel, but the sensor of the spoon position often comes into contact with aluminum soup after the head is stained with aluminum, which will lead to inaccurate induction resulting in a reduction in the amount of soup given. (See working sheet for annexes to the report for details)<br>4. At present, die-casting process and factory documents set inspection requirements are sampling, machining parts are required to carry out visual inspection, but this shipment is for blank pieces so not identified.<br>Corrective action:<br>1. It is planned to be guided and confirmed by biotech engineers and quality engineers in the field when production is made by the end of April, and after the process is stable, X-ray verification of 300 consecutive products in the process.<br>2. By verifying the die-casting process parameters of the die-casting process card after optimization locking, each production by the foreman corresponding to the machine die-casting parameters of the transfer input, each shift inspector to check the parameters.<br>3. The die-cast inspection card clearly indicates Festo's sand hole requirements.<br>4. Transfer product management regulations have been clearly required and through the foreman inspectors and operators for training effect verification for curing.<br>5. The setting and working steps of the soup machine can be found in the 8D report annex worksheet ,"The parameter setting and working steps of the soup machine".
正在翻译中..