Weldments shall be fabricated with operations including joint preparation, cleaning, welding, cleaning, leak checking, final inspection, and packaging. Additional in-process inspection of parts, components, and assemblies shall be conducted as necessary to ensure the finished weldments meet the requirements on drawings and requirements defined in this specification. Process parameters shall not deviate from documented operation ranges listed in approved WPS.