Before installing the column formwork, the vertical and horizontal axis and the surrounding sidelines should be popped out on the foundation floor, the axis and sidelines of the columns at both ends should be popped out first, and then the axis and sidelines of the columns in the middle should be popped out by pulling the through line.<br>
正在翻译中..