All commissioning operations shall have been completed, including pressure leak checks, blinds removal, drying and nitrogen purge of equipment and piping interested by process fluids (venting nitrogen pressure to blow down through PSVs bypasses and through drains on the lowest points, pipes and equipment). The system should be filled with nitrogen at the LP blowdown back pressure before proceeding further.