At the time of writing (end of 2012) two of three AEI-SAS have been completed and installed in the vacuum system, ready to be equipped with the SPI. The third AEI-SAS with the West-table will be assembled during the course of the year 2013. This table will be used as a test-bed for improvements of the first two AEI-SAS tables.