组织入厂质量检验科重新核实故障模式。组织相关改进人员针对3319车型进行分析。组织GA,R&D,入厂检验人员进行插接件现场评估。针对线束插接的英语翻译

组织入厂质量检验科重新核实故障模式。组织相关改进人员针对3319车型进

组织入厂质量检验科重新核实故障模式。组织相关改进人员针对3319车型进行分析。组织GA,R&D,入厂检验人员进行插接件现场评估。针对线束插接问题提出评审需求给入厂质量检验科。按不同故障模式整理问题清单,形成改进计划。针对总装提出的线束插接评审需求准备相关插接件。与储气筒漏气问题共同分析。落实接头切换原因,新状态体现时间。针对卡套式密封结构需要R&D组织相关人员分析,10月30日前给出初步优化方案。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Organize the incoming quality inspection department to re-verify the failure mode. <br>Organize relevant improvement personnel to analyze the 3319 model. <br>Organize GA, R&D, and factory inspection personnel to conduct on-site evaluation of connectors. <br>In view of the wiring harness plug-in problem, the review requirements are proposed to the incoming quality inspection department. <br>Organize the problem list according to different failure modes and form an improvement plan. <br>Prepare related connectors for the wiring harness plug-in review requirements proposed by the final assembly. <br>Analyze together with the gas cylinder leakage problem. <br>Determine the reason for the joint switch, and the new state reflects the time. <br>For the card sleeve type sealing structure, the relevant personnel of the R&D organization need to analyze, and a preliminary optimization plan will be given before October 30.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Organize the factory quality inspection section to re-verify the failure mode.<br>Organize improvement personnel to analyze the 3319 models.<br>Organize GA, R.D., in-plant inspectors to conduct on-site evaluation of plug-ins.<br>For the harness plug problem put forward the evaluation needs to the factory quality inspection section.<br>Organize the list of problems according to different failure modes to form an improvement plan.<br>Prepare the relevant connectors for the harness plug-in review requirements presented by the assembly.<br>The gas leakage problem with the air reservoir is analyzed together.<br>Implement the reason for connector switching, the new state reflects the time.<br>In view of the analysis of the relevant personnel of the R-D organization, a preliminary optimization plan is given by October 30.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Organize the quality inspection department to re verify the failure mode.<br>Organize relevant improvement personnel to analyze 3319 model.<br>Organize GA, R & D and incoming inspectors to evaluate the connectors on site.<br>In view of the wiring harness plug-in problems, put forward the review requirements to the incoming quality inspection department.<br>Sort out the problem list according to different failure modes and form the improvement plan.<br>Prepare relevant connectors according to the requirements of wiring harness plug-in review proposed by general assembly.<br>It is analyzed together with the air leakage of air reservoir.<br>Implement the reason of the joint switching, and the new state reflects the time.<br>In view of the need for R & D to organize relevant personnel to analyze the jacketed seal structure, a preliminary optimization scheme is given before October 30.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: