Organize the incoming quality inspection department to re-verify the failure mode. <br>Organize relevant improvement personnel to analyze the 3319 model. <br>Organize GA, R&D, and factory inspection personnel to conduct on-site evaluation of connectors. <br>In view of the wiring harness plug-in problem, the review requirements are proposed to the incoming quality inspection department. <br>Organize the problem list according to different failure modes and form an improvement plan. <br>Prepare related connectors for the wiring harness plug-in review requirements proposed by the final assembly. <br>Analyze together with the gas cylinder leakage problem. <br>Determine the reason for the joint switch, and the new state reflects the time. <br>For the card sleeve type sealing structure, the relevant personnel of the R&D organization need to analyze, and a preliminary optimization plan will be given before October 30.
正在翻译中..