First of all, thank you for your careful reading of my quotation. But I have to say that the initial May 11 offer is really for reference only, the general price will be quoted below the actual price to attract customers. It's not fair if you get $2,200 from a reference quote, and I really don't know how your data came about. I have an explanation every time I email, but it is, and I am not shying away from your question.<br><br>You reported the actual demand, 100m, 130-110mm, because you are indeed a buyer, in order to express good faith, I also in accordance with the low price of 13410 U.S. dollars to you, only in accordance with your needs to change the configuration sheet of the rig. He later applied to the company for $300 less. In the quotation, I didn't write 60 or 60 meters, you may have mistakenly. About 80-50, I did neglect, the original quotation 80 units are meters, but although I give you the actual quotation written is also rice, but the calculation is in accordance with 50, 2 meters a calculation price, the actual price is 100 meters. This is a problem for you, I'm sorry.<br><br>The quality of the configuration of the drill will be different, mud pump has two cylinders three cylinders, I give you a three-cylinder, the ability will be stronger. Drill bit is also set teeth, although are the same specifications of the drill pipe, but different manufacturers of raw materials, quality will be different.
正在翻译中..