BASF LDPE plant of Yangzi Petrochemical Co., Ltd. plans to carry out equipment overhaul in April 2020, mainly for the overhaul of four ABB synchronous motors of LDPE plant km11201 (11000v / 5200kw), km21201 (11000v / 5200kw), km11202 (11000v / 176000kw) and km21202 (11000v / 176000kw). The last overhaul was in April 2015, and the current operation is in good condition. The main work of the power company is the maintenance and sealing treatment of the motor water cooler, as well as the cooperation with the replacement of the motor and packing, the disassembly and assembly of the bearing shells, and the inspection and replacement of the excitation elements. In order to ensure the quality of the maintenance, this plan is specially prepared.<br>
正在翻译中..