(5) After the completion of the project, clean up the construction site in a timely manner and remove the equipment in a timely manner. After the project was delivered for use, the civilization withdrew from the construction team. Construction standardization, standardization, project land to achieve the "four modernization" standards, that is, "the appearance of standardization, sports and recreational activities popularization, construction site apartment, staff canteen catering." The construction site should be fully planned and reasonably arranged. According to the approved construction organization design and layout, the construction production and living facilities are arranged reasonably. Set up drainage ditches around the construction site, complete the "three links and one flat" in time, and create a good construction environment and civilized construction site. Construction site processing, prefabrication, material stacking site with concrete hardening. Water and electricity pipelines are erected according to the norms, and the production and living areas are arranged separately. "Six cards and one map hangs on the site. Hanging complete, beautiful, neat, finished products in accordance with the prescribed materials, patterns, colors, content and other standard format symposity manufacturing. Semi-finished products, raw materials in strict accordance with the construction organization design layout of the location stacking. All materials should be classified, stacked and labeled. Indoor layout: on-site office or duty room, wall hanging (posted) site master plan layout, construction image progress map, organization, work responsibilities and work system. Team image: Construction workers must wear clothes.
正在翻译中..