4 INSTALLATION OF ROLL CRUSHER UNITS4.1 INSPECTION OF CONNECTION FLANGES4.1.1 Special attention shall be paid to the correct dimensions for the connection flange of the Roll Crusher Units. The connection flanges must be well aligned and solidly supported when installed. This work must be done with the utmost care since it is one of the main conditions for a satisfactory running of the entire machine.