1. (N) Procedures for sample collection are in place.2. (N) Procedures for sample preparation and analysis are in place.3. (N) Procedures for calculating adjustments to process/tank chemistry are in place. 4. (N) Procedures are in place to manage line shutdown, part recall, and system recovery when out-of-control or out-of-specification conditions exist."