Then according to the design slope requirements to pull the line to find slope, do gray cake, down the drainage direction of the ribs, the spacing of the ribs for about 1.5m, in the drainage ditch, rainwater mouth to find water, after the punch can be smeared to find the flat layer.
正在翻译中..