1. Collaborate with SLB AGS Quality to establish a FA joint technical review mechanism. AGS will share the historical IFRs of its suppliers on the product with Zhongnan, and verify and confirm the raw materials/special processes/technical requirements/key feature dimensions/historical quality issues through the technical review form.<br>2. When technical personnel prepare ITP and inspect bubble charts, the raw material requirements on the drawings must be marked with bubbles as inspection points, so that inspectors and documenters can verify and confirm the compliance of the actual materials used.<br>3. Conduct case sharing and training on identifying technical drawings and specifications, so that all technical personnel can accurately understand the drawings/technical requirements and specifications, and relevant production/inspection and quality personnel can also learn from them to avoid similar problems.
正在翻译中..