The steam heating pipe of the magnesium hydroxide cabin has been staked out. Considering the reverse integrity and error of the hull structure, if there is interference, it needs to be adjusted on site.
The steam heating pipe of the magnesium hydroxide tank has been laid out, considering the reverse integrity and error of the ship structure. If there is any interference, it needs to be adjusted on-site.
The steam heating pipe of magnesium hydroxide cabin has been laid out. Considering the reverse integrity and error of the hull structure, in case of interference, it needs to be adjusted on site.