once testing is complete,power off the pump by switching the green button to open and verifying that the pump control display is off.Close the feedstock ball valve after the feedstock pump has been turned off.The syngas generator can be kept hot,with the heaters for the vaporizer and reactor on,or the system can be completely turned off,with powered removed,and left to cool