• Detailed descriptions of all required preventive procedures e.g. alarm signal description of the inverters, etc.• Template for all preventive procedures to be used as proof of work• Detailed descriptions of all foreseeable corrective procedures• Template for all foreseeable corrective procedures to be used as proof of workIt is necessary to register all the evaluations results, the relevant failures, and the main actions in a book following the scheme below:• Date of incidence• Description of failure• Incidence location• Required action2.32.2 O&M Support Proposal RequirementThe Contractor is requested to provide a comprehensive Operation and Maintenance Service Support Proposal in Technical Proposal Section 4, with service performance detailing and guarantees.1. Operational Inspections & Reportinga. Project Management Inspections:i. Daily Tasks & Check Sheetii. Weekly Tasks & Check Sheetiii. Monthly Tasks & Check Sheetb. Operations & Maintenance Reports:i. Monthly Operational Statusii. Site Power Output & Loss Reportsiii. Site Overall Performance including Performance Ratio, Availability, etc.iv. Monitoring and coordinating with the Grid Operatorv. Spare part inventory reportc. Corrective Maintenanced. Preventive Maintenancee. Manpower service ratesf. Warranty Repairg. Minimum six (6) times cleaning PV module in a yearh. Training for the Employer’s personnel