2. Establish GA re inspection quality gate for color parts<br>3. Redefine the evaluation boundary of color parts<br>4. Grid control by assembly area<br>5. Set up joint inspection teams for color parts and non color parts respectively, fully cover all appearance parts in the production process once a week, output evaluation, form a standing book for problem points, and track the improvement effect;<br>6. Quality gate of coating resident in the final assembly: since May 2021, through the resolution of the project meeting, start the secondary re inspection quality gate of coating, and give priority to the secondary re inspection of scratched high-frequency color parts in the final assembly sub assembly area;<br>7. Organize relevant evaluation links to review the color parts at this stage, re standardize the evaluation boundary of color parts, and sign on site for implementation;<br>8. Carry out regional grid management and control on the parts covered by the project to ensure that each part has a person in charge from incoming material, loading and mutual inspection;<br>
正在翻译中..