(1) The working bridge is installed to facilitate the staff to operate的英语翻译

(1) The working bridge is installed

(1) The working bridge is installed to facilitate the staff to operate the bridge. The height of the working bridge is related to the size and form of the gate. Because of the flat gate, the fixed hoist is used. After the gate is lifted, it cannot affect the maximum discharge flow, and there is a certain extra part. According to the work needs and design specifications, the working bridge should be directly above the working gate and used to support the working bridge.(2) The height of the working bridge depends on the form of the gate and the water surface of the gate hole. The difference between the elevation of the bottom edge of the beam of the working bridge and the elevation of the bottom edge of the breast wall when a fixed gate hoist is used for the plane gate The bottom elevation of the working bridge beam is 27m.The working bridge adopts an assembled structure, and the bridge deck is placed on two longitudinal beams. The total width of the working bridge is 3600mm. The height of the longitudinal beam of the working bridge is 800mm, the width of the longitudinal beam is 1/2 ~ 1/3 of the height, and 300; the height of the transverse beam of the working bridge is 2/3 ~ 3/4 of the longitudinal beam, 600mm, and the width is 1 / h of the height 3 ~ 1/2, take 250mm, and the thickness of theworking bridge is 100mm . The layout of the working bridge is shown in Figure 2-2.
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
(1) The working bridge is installed to facilitate the staff to operate the bridge. The height of the working bridge is related to the size and form of the gate. Because of the flat gate, the fixed hoist is used. After the gate is lifted, it cannot affect the maximum discharge flow, and there is a certain extra part. According to the work needs and design specifications, the working bridge should be directly above the working gate and used to support the working bridge.<br>(2) The height of the working bridge depends on the form of the gate and the water surface of the gate hole. The difference between the elevation of the bottom edge of the beam of the working bridge and the elevation of the bottom edge of the breast wall when a fixed gate hoist is used for the plane gate The bottom elevation of the working bridge beam is 27m.<br>The working bridge adopts an assembled structure, and the bridge deck is placed on two longitudinal beams. The total width of the working bridge is 3600mm. The height of the longitudinal beam of the working bridge is 800mm, the width of the longitudinal beam is 1/2 ~ 1/3 of the height, and 300; the height of the transverse beam of the working bridge is 2/3 ~ 3/4 of the longitudinal beam, 600mm, and the width is 1 / h of the height 3 ~ 1/2, take 250mm, and the thickness of the<br>working bridge is 100mm . The layout of the working bridge is shown in Figure 2-2.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
(1) The working bridge is installed to facilitate the staff to operate the bridge. The height of the working bridge is related to the size and form of the gate. Because of the flat gate, the fixed hoist is used. After the gate is lifted, it cannot affect the maximum discharge flow, and there is a certain extra part. According to the work needs and design specifications, the working bridge should be directly above the working gate and used to support the working bridge.<br>(2) The height of the working bridge depends on the form of the gate and the water surface of the gate hole. The difference between the elevation of the bottom edge of the beam of the working bridge and the elevation of the bottom edge of the breast wall when a fixed gate hoist is used for the plane gate The bottom elevation of the working bridge beam is 27m.<br>The working bridge adopts an assembled structure, and the bridge deck is placed on two longitudinal beams. The total width of the working bridge is 3600mm. The height of the longitudinal beam of the working bridge is 800mm, the width of the longitudinal beam is 1/2 ~ 1/3 of the height, and 300; the height of the transverse beam of the working bridge is 2/3 ~ 3/4 of the longitudinal beam, 600mm, and the width is 1 / h of the height 3 ~ 1/2, take 250mm, and the thickness of the<br>working bridge is 100mm . The layout of the working bridge is shown in Figure 2-2.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
(1) 安装工作桥是为了方便工作人员操作。工作桥的高度与闸门的尺寸和形式有关。由于闸门是平的,所以采用固定式启闭机。闸门启闭后,不会影响最大泄流量,且有一定的附加部分。根据工作需要和设计规范,工作桥应位于工作闸门正上方,用于支撑工作桥。<br>(2) 工作桥的高度取决于闸门的形式和闸门孔的水面。平面闸门采用固定启闭机时,工作桥梁底缘高程与胸墙底缘高程之差工作桥梁底高程为27m。<br>工作桥采用装配式结构,桥面置于两根纵梁上。工作桥总宽度3600 mm。工作桥的纵梁高度为800mm,纵梁宽度为高度的1/2~1/3,宽度为300;工作桥的横梁高度为纵梁的2/3~3/4,高度为600 mm,宽度为高度的1/h,取250 mm,厚度为<br>工作桥为100 mm。工作桥布置如图2-2所示。<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: