Complete the revision of the operating procedures for the air conditioning system in workshop 1 of solid preparations; Responsible party: Air conditioning water supply 11.29<br>Complete the revision of the operating procedures for the solid preparation workshop 1 and QC pharmaceutical water system; Responsible party: Air conditioning water supply 11.29<br>Complete the confirmation of solid air conditioning system equipment and carry out the work; Responsible party: Air conditioning water supply 11.28<br>Complete the confirmation of solid and QC pharmaceutical water system equipment; Responsible party: Air conditioning water supply 11.28<br>Continuously carry out training on basic knowledge of personnel positions; Responsible party: Air conditioning water supply 11.28<br>Complete the integrity inspection and rectification of solid, QC, and warehouse on-site data; Responsible party: Office 11.28
正在翻译中..