CONTRACTOR’s free-issued MATERIALS and EQUIPMENT will be broken down to a suitable condition for shipping and SUBCONTRACTOR is responsible for all required assembly to bring the MATERIALS and EQUIPMENT from their shipping condition to the proper installed condition