In the 4th week of July, the main rising area of PTU in the manufacturing process is the chassis and final inspection area. The main problems are tube/line interference, appearance and poor assembly.
In the fourth week of July, the main up-and-forth areas of the manufacturing process PTU were the chassis and final inspection areas, the main problems were tube/line interference, appearance and poor assembly.
In the fourth week of July, the main rising areas of PTU in the manufacturing process are chassis and final inspection area, and the main problems are pipe / line interference, appearance and poor assembly.<br>