1. Strengthen the protection of edges and corners during assembly;<br>2. Maintenance and distribution of tooling protective rubber pier<br>3. Strengthen the patrol inspection of the team leader, and simultaneously notify the dynamic inspector to inspect the boarding and alighting operation specifications;<br>4. Strengthen the control ability of pre sequence links, and add self inspection items before static commissioning<br>5. Strengthen the self inspection in the sub assembly process and strictly implement the "three noes" principle for the parts<br>6. Adjust the reverse installation of the flat pad, and use the arc surface to contact the paint surface;<br>7. Replace the protective rubber block;<br>8. Feed back the external inspection of parts and components, and increase the sampling inspection frequency
正在翻译中..