The out-in production line was completed and put into operation in the Hehuan Road factory (original) in September 2009. During this period, due to the overall strategic adjustment of the company, it has experienced two times of cross factory relocation of the line body, which is currently distributed in the south<br>The assembly workshop of No. 1 workshop of Ganggong Industrial Park mainly produces the full-automatic wave wheel washing machine which is sold back to Japan, and produces and serves core customers such as Yamada, Aikeya, sharp, etc.<br>The production line consists of 6 production teams, including surface frame assembly, outer barrel assembly, assembly team 1, assembly team 2, engineering inspection and packaging team, and direct production management including production team leader and line leader<br>There are 7 managers and 127 direct operators. After many times of post optimization, rhythm balance and quality standard sorting, the annual production efficiency has been steadily improved by about 20% every year, and the annual production capacity has been increased from the initial 25<br>Million to 600000;<br>The production line adopts material tracking of key electrical parts, full torque inspection of key posts, crimping and voltage stabilizing control of key harnesses, first set confirmation, 100 sets management, high water level detection and motor power<br>The inspection is higher than the quality management standard of other models, and it is currently the highest quality standard line of single category washing machine products in the manufacturing center;<br>
正在翻译中..