- The concrete has been repaired, the mouth between the two brick walls is full, the mouth between the bottom frame of the wooden door and the brick wall, the floor is cleaned and the triangular line of the floor, before waterproofing, must be repaired and satisfied before waterproofing can be carried out project.
正在翻译中..