The two sides of the dam site are symmetrical, the mountain is steep and the riverbed is narrow. The RCC gravity dam with a dam height of more than 100 meters is arranged on the left bank of the underground powerhouse. The main engineering geological problems exist in the dam foundation, such as anti-sliding stability of the dam foundation, seepage of the dam foundation, deformation of rock mass and high slope on both sides of the dam foundation.