This week, two new improvement projects were added; the shift flexible shaft and multiple interference and the differential lock pipe joint leakage between the middle axle wheels; the air pipe of the transmission controller was not fixed after the measures were verified to be qualified, and it was transferred to the supervision period.<br>
正在翻译中..