In this design, we do is Linyi to The West road design, the overall divided into the road surface of the flat horizontal design, road design, and finally about the drainage part of the design. Design selection of the relevant software is Haiti 2013, and CAD2008, in the process of design has repeatedly asked students and guidance teachers. At the same time, it also helps us change some of the habits of being lazy when dealing with things. From the initial collection of information, collating information, to the selection of the scheme, to determine the program, and then to start to start road-based engineering, road works and route drainage design, each step is ring-linked, closely linked, any one of the steps will produce omissions or omissions, will bring a lot of inconvenience to the future design. In short, this time the design in the continuous learning and continuous correction in the successful completion.
正在翻译中..