④对第一盘拌合物,在出机口和灌注入模口,分别检测其温度和坍落度,确认入模混凝土拌合物温度不超过30℃,方可继续施工。⑤计算高气温下混凝土坍落的英语翻译

④对第一盘拌合物,在出机口和灌注入模口,分别检测其温度和坍落度,确认入

④对第一盘拌合物,在出机口和灌注入模口,分别检测其温度和坍落度,确认入模混凝土拌合物温度不超过30℃,方可继续施工。⑤计算高气温下混凝土坍落度在运输途中的损失值,提醒和督促值班试验员,预留坍落度损失值。⑥施工过程中一旦发现混凝土拌合物温度超过指标,应立即督促施工现场检查原因,并采取有效降温措施。⑦混凝土浇筑完成后,检查初浇混凝土的抹面收浆工作,检查初凝至终凝期间是否有收缩裂缝。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
④ For the first tray of mix, check its temperature and slump at the outlet and pouring port respectively, and confirm that the temperature of the concrete mixture entering the mold does not exceed 30°C before construction can continue. <br>⑤ Calculate the slump loss value of concrete during transportation under high temperatures, remind and supervise the on-duty tester, and reserve the slump loss value. <br>⑥ Once the temperature of the concrete mixture is found to exceed the indicator during the construction process, the construction site should be immediately urged to check the cause and take effective cooling measures. <br>⑦After the concrete pouring is completed, check the grouting work of the initially poured concrete and check whether there are shrinkage cracks from the initial setting to the final setting.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
④ For the first batch of mixture, the temperature and slump of the concrete mixture shall be tested at the outlet and injection mold mouth respectively, and it shall be confirmed that the temperature of the concrete mixture entering the mold does not exceed 30 ℃ before continuing construction.<br>⑤ Calculate the loss value of concrete slump during transportation at high temperatures, remind and urge duty testers to reserve the loss value of slump.<br>⑥ Once the temperature of the concrete mixture exceeds the target during the construction process, the construction site should be immediately urged to check the cause and take effective cooling measures.<br>⑦ After the completion of concrete pouring, check the plastering and slurry collection work of the initial pouring concrete, and check whether there are shrinkage cracks during the period from initial setting to final setting.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
(4) For the first batch of mixture, the temperature and slump of the mixture at the outlet of the machine and pouring into the mould are tested respectively, and the construction can be continued only after the temperature of the concrete mixture injected into the mould is confirmed to be less than 30℃.<br> ⑤ Calculate the loss value of concrete slump in transit at high temperature, remind and urge the operator on duty to reserve the slump loss value.<br> ⑥ Once the temperature of concrete mixture is found to exceed the index during construction, the construction site shall be immediately urged to check the reasons and effective cooling measures shall be taken.<br> ⑦ After the concrete pouring is completed, check the plastering and slurry collection of the initial pouring concrete, and check whether there are shrinkage cracks during the initial setting and final setting.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: