The height of the cave is 7.5m; the pile number from the left line is ZK58 + 860 ~ ZK61 + 800, the tunnel length is 2940m, the project construction is ZK58 + 860 ~ ZK60 + 333.635, the length is 1473.635m, and the maximum buried depth of the top of the cave is 214m; The pile number is YK58 + 865 ~ YK61 + 827, the tunnel length is 2962m, the project construction YK58 + 865 ~ YK60 + 355 length is 1490m, the maximum buried depth of the top of the cave is 220m; the plane linearity of the entrance and exit of the tunnel are circular curves