The specific practice is to set up the pre-cut sewage cut pipe, cut the pipe diameter according to the multiple of the cut-off, dry season sewage and initial rainwater into the sewage cut-off pipe, when the amount of rainwater increases more than the water transfer capacity of the cut-off pipe, part of the sewage and rainwater will be through the overflow pipe in the cut-off well spread to the river, contaminated water body
正在翻译中..